Complete assessment and re-design of the entire Telecom and I.T. Infrastructure and Systems of the over 21 Guest Buildings, Check-in, back of house and public space. SYNGINC was hired to do a full assessment and evaluation, design and construction management of the Telecom and I.T. infrastructure and systems following the devastating Hurricane Irma. The resort was turned back up January 4th after (16) months of assessment, planning, design, implementation.
The systems SYNGINC designed and managed were:
- Phone System
- HSIA Warless
- A/V Sound Systems
- Satellite Distribution
- Security Surveillance
- Two-Way Radio System
- Carrier Entrance
- Property Campus Backbone Infrastructure (Copper/Fiber)
- Property Customer Owned Outside Plant
- Full MEP / Telecom Engineering of MDF/IDF